Tappen Zee Bridge:

3.2 mile long NY Bridge between Westchester and Rockland counties to replace the aged bridge over the Hudson River. Providing consulting and training services with Topcon Equipment for Control Network at bridge site and Bridge Assembly in Coeymans, NY

Universal Studio's (Orlando FL) Volcano Bay Water Theme Park:

Prepare finished grade surface model for use with Topcon 3D machine guidance system. Calculated earthwork volumes periodically throughout project.

ISTAR 1101 Ocean Avenue, Asbury Park, NJ:

Project is a new 16 story, cast in place concrete structure. The building is located along the Jersey shore. Provide consulting services and support to Palatial Development Corporation, whom are using Topcon GT/PS Robotic Total stations along with Topcon DL-503 (digital level) with Magnet Field for construction layout.

QUAD-C – Utica, NY. SUNY

 SUNY Poly Utica site. 253,000 Square foot technology Complex with clean room. Build subgrade excavation surface for footers. Layout Step footers, piers, and anchors. Plumb Steel columns. Layout floor to floor building plan for carpenters.

Gas Well Pads and Gas Compressors Sites:

SetUp GPS control, build line work files and developed 3d TIN's and Models for efficient grading and use with Topcon and Trimble 3D Machine control on gas well pads and gas compressor sites for northern Pennsylvania. Clients include Southwestern Energy, Chesapeake Energy, and Williams Energy. The models have improved production by over 20% with stakeless grading techniques.

Hardscrabble Wind Turbines:

Field staking, layout, mapping and as-built surveys for 37 wind turbines, 25 miles of new road and 22 miles of collection line. Clients include Iberdrola Renewables, Mortenson Construction, Borneke Construction, Dyer Construction

Verizon Wireless:

Created digital photo simulations for proposed cell towers to be presented during permitting process. Use digital photographic equipment, GPS, and 3D CAD to develop accurate and realistic simulations of cell towers on hill sides, hidden in silos, water towers, and on roof tops. Click on image to see renderings.

 

Hualalai Village, Hawaii:
Developed grading plan for 100± acres subdivision. Site required a balance of excavation quantities with many roads near maximum slope of 20%. Also containing ADA accessible parking, ramps and paved paths. This project involved training and CAD support, plus coordination with Architects, engineers and designers in Illinois, California and Hawaii. See site rendering.

Interstate 89 from St. Albans – Swanton, Vermont:
Project required reconstruction of existing roadway and subbase, without changing bridges. Coordinated with VTRANS using InRoads linear regression tools to establish as-built horizontal and vertical alignments for 13 miles of highway. Met required tolerances of 0.5′ horizontal on roadway and 0.2′ tolerances on bridges.

Panama Canal
Helped to develop alternative bypass near the Pacific entrance around the locks at Pedro Miguel and Miraflores Lake. Responsible for developing alignments, cross-sections, profiles, quantity take-offs, evaluation drawings, and presentations.

Utica Rome Expressway
New York State Department of Transportation. Region 2, Utica, New York. 3.5 miles of new highway construction. Responsibilities included the creation of DTM for earthwork quantities. Built a full wire frame model of entire project for an interim earthwork phase, which included 3m surcharge in wetland areas. Also created full wire frame model, including ramps, intersections and three bridges for final design. This project included a unique coordination with sub consultant whom designed the open ditch drainage system that was merged into the DTM. See simulations.

Boyabat Dam, Turkey
(1999) 200m x 300m Hydro Electric Dam in Turkey for review by the International Administry of Power. Project included the creation of DTM’s for alluvium excavation, rock excavation and concrete volumes exceed 2.3 million cubic meters. The wire frame model was rendered to create quick vision and video simulations of finished dam in relationship to existing fault lines.

Rome High School, Rome, New York
Developed proposed DTM of new building location with access roads, parking lots, retention ponds, running track and ball fields. This DTM aiding in creating a balance of cut and fill for this project.

Prepare Surface Models and Setup 3D GPS Machine Guidance System for Layout of the following Athletic Tracks and Fields

Pittsford Central School District
Altmar Parish Williamstown Central School
Aurburn High School
Oxford Acamedy & Central Schools
Seneca Falls Central School District
Solvay Union Free School District
Shenendehowa Central School District
Geneva City Central School District
South Seneca Central District
Union Springs Central School District
Port Byron Central School District
Cortland City School District

Holley Central School District
Brockport Central School District
South Glens Falls Senior High School
Hudson Falls Central School District
Hoosick Falls Central School District
Queensbury Union Free School District
Lansingburgh Central School District
Utica College
SUNY Binghamton
SUNY Albany
SUNY Utica
Corning Community College